We are proposing three things.

Augmented reality on the printed matter of the Simhastha — whatever gets printed, and by whichever office. Augmented reality at the heritage sites of the district. And a network of VR Centres, each combining virtual reality zones, AR mirror screens, interactive screens and AI guide kiosks. This document explains what each of those is, what it would do for the Simhastha, and at what scale it can be built.

Submitted byIIT Guwahati Principal InvestigatorProf. (Dr.) Debayan Dhar DepartmentDesign
Contents24 sections
01The proposalIn one page
01

AR on printed material

Every route card, darshan calendar, pass, prasad box, hoarding and newspaper page carries a layer that can be opened with a phone. The printed sheet gains a voice, a moving map, a translation, and the ability to correct itself after it has been printed.

What it adds: reach, at national scale, before anyone travels — and it is the only one of the three that occupies no land, needs no staff and forms no queue. Four classes of experience, applied to any printed artefact.

02

AR at the heritage sites

A visitor standing at a temple, a cave or a fort holds up a phone and the place explains itself — what is missing, rebuilt in front of them; what they are looking at; and something they can carry away and repeat.

What it adds: somewhere else worth being. It converts names on a map into destinations, which is the only kind a diverted pilgrim accepts — and it remains valuable long after 2028. 10 sites priced in phase one, 150 authored experiences.

03

VR Centres

Buildings that hold several things at once: virtual reality zones with seated headsets, interactive screens to explore at your own pace, AI guide kiosks that need no device, and mirror screens that place the visitor inside another century.

What it adds: relief. Sited at the parking nodes, stations, holding areas and medical camps, they give a legitimate reason to be somewhere other than the ghat during the hours the ghat cannot take anyone else. 8 VR Centres, 180 VR stations.

And one record underneath all three. Every interpreted heritage site is captured to survey standard as part of its rate, and the digital twin add-on assembles those captures with the eight walkthrough spaces of the VR library into a single georeferenced record. The AR layers and the VR experiences are built from that record, which is why they agree with each other and why a correction made once propagates everywhere.

02PlainlyWhat each of these actually is

Five terms, explained without jargon.

These words get used loosely and interchangeably, and they are not the same thing. Each does a different job, suits a different visitor and costs a different amount of space and staff. It is worth being precise about them before any decision is taken, so here is each one described as it would actually be experienced — alongside something comparable that already exists in India.

Augmented reality demo
Term 01

Augmented reality — AR

The visitor holds up a phone. On the screen they see exactly what the camera sees — the temple in front of them, the printed page in their hand — and standing on top of it, in the correct position, something that is not physically there. The tower as it stood before it fell. The name of the carving they are looking at. A voice explaining it in Marathi.

Nothing is built, installed, drilled or attached. The addition exists only on the visitor's screen. Walk away and the site is exactly as it was.

Where this already exists: the Pradhan Mantri Sangrahalaya in Delhi uses augmented reality and smartphone-based exhibits through its galleries. Most people have also met a simple form of it in a phone camera filter.

Virtual reality demo
Term 02

Virtual reality — VR

The visitor sits in a chair and an attendant places a visor over their eyes. The room goes away. They are standing at Kushavarta at five in the morning, before anyone has arrived, and when they turn their head they see what would be beside them. It is not a film being watched. It is a place being stood in.

Eight to twelve minutes, seated throughout, an attendant beside them, and then the visor comes off and they are back in the chair.

Where this already exists: the Anubhuti zone at the Pradhan Mantri Sangrahalaya runs VR experiences for the general public, as do VR darshan counters at Kashi Vishwanath and along the Vaishno Devi yatra route.

Interactive screen demo
Term 03

Interactive screens and AI guide kiosks

Large touch screens — the size of a door, or laid flat like a table — and beside them a kiosk that answers questions out loud in the visitor's own language. Nobody narrates and nobody queues. The visitor decides what to look at, in what order, at their own speed.

Neither asks the visitor to own or wear anything. This is the route for the pilgrim with no smartphone, and for anyone who declines a headset.

Where this already exists: the Raigad 4D show and the revolving show at Shivsrushti in Pune; the Shaniwarwada sound-and-light show. The difference here is that ours plays from a computer rather than a fixed reel, so the content can be changed the same afternoon and can run in twelve languages rather than one.

Interactive screens demo
Term 04

Interactive screens

Large touch screens — the size of a door, or laid flat like a table. Nobody narrates. The visitor decides what to look at, in what order, at their own speed, and goes as deep as they want. No queue, no session length, no staff required.

Suited to the things people want to explore rather than be told: all thirty-two surveyed heritage sites as a browsable map, the thirteen Akharas and their lineages, the Godavari from Brahmagiri to the sea.

Where this already exists: the Pradhan Mantri Sangrahalaya is built around multi-touch walls and interactive kiosks; most new state museums in India now include them as standard.

Mirror screen demo
Term 05

Mirror screens

A large screen showing the space in front of it, live, the way a mirror does — except that what it shows has been changed. A family standing before it sees themselves on the same ghat, in their own clothes, with the Nashik of eight hundred years ago standing behind them.

The city is what changes, not the person. No face is stored and no individual is altered — a deliberate design decision explained in full later in this document.

Where this already exists: similar installations appear in Indian science centres and at large exhibitions; the form is familiar, the application to a heritage streetscape is not.

Digital twin capture
Term 06

The digital twin

Not something a visitor ever sees. It is an exact three-dimensional record of a real place — a temple, a ghat, a cave — made by scanning it, accurate enough to measure from. Think of it as a photograph that can be walked around inside.

It is the master copy. The AR layer at each site and the VR experiences in the centres are built from it, which is why they never contradict each other. It is also a permanent conservation record of the site as it stood.

Where this already exists: the Archaeological Survey of India and international heritage bodies use scanning of this kind routinely for conservation records of protected monuments.

03The caseHow each one amplifies the Simhastha

Three different jobs. Deliberately not three versions of the same one.

Each component was chosen because it does something the other two cannot. Taken together they cover a pilgrim from the moment they read about the Simhastha in another state to the moment they show someone at home what they saw.

Component 01 amplifies

Reach — at no cost in land or staff

The Authority is printing regardless. Augmented reality turns that existing effort into something that speaks, moves, translates and updates. A route card printed in June still gives the correct instruction in August, because the layer behind it can be changed the same morning a ghat closes.

And it is the only component with no footprint at all. It needs no plot, no power, no attendant and no egress plan. It happens in a queue, on a train, in a tent, and in a household in Nanded a month before anyone travels.

Component 02 amplifies

Dispersal — and a legacy after 2028

Part of the pressure on the main ghats is simply that people have nowhere else to be. A site with nothing at it is a name on a map; a site that explains itself is a destination. Ten interpreted sites in phase one, drawn from a surveyed inventory of thirty-two, give the Authority somewhere real to send people.

And unlike everything else in this proposal, this component does not end. The layer stays live at every site after July 2028, which converts a twenty-one month event into permanent tourism infrastructure for the district.

Component 03 amplifies

Relief — it makes waiting acceptable

Crowd managers do not need people to move faster. They need people to accept a hold. The traffic plan already stops private vehicles several kilometres out and moves pilgrims onto shuttles — which means captive waiting is a designed feature of the plan, not an accident.

An VR Centre at that point turns a wait into something received. And several ways in under one roof means nobody is excluded — the visitor who will not wear a visor still gets the screens, the kiosk and the mirror.

And they amplify each other. The print seeds the heritage visits — a family decides to see Gondeshwar while reading a supplement in Pune. The VR Centres carry the famous sites that the heritage layer deliberately leaves out, so Ramkund gets more interpretation, not less. And all three are drawn from the same digital twin, so a pilgrim who meets the Simhastha on a newspaper page, then at a cave, then in a recliner, is being told one consistent story rather than three unrelated ones.

04ScaleWhat the full programme comes to

Every figure below is a delivery quantity, arrived at by counting real sites, real artefacts and real seats. Each is broken down in full in the sections that follow, and each can be scaled by the Authority in defined tiers.

Anyprinted artefact the Simhastha produces can carry the layer, across four classes of experience
10heritage sites priced in phase one, selected from a surveyed inventory of 32 — all chosen for where a visitor can stop and look
150AR experiences — fifteen at each of the ten sites, each authored across three layers
8VR Centres — 2 anchor centres and 6 node centres, sited across both towns and the corridor between them
180VR stations — 30 at each anchor centre, 20 at each node centre
40interactive screen stations, plus 10 AR mirror screens and 14 interactive AI guide kiosks
8VR experiences in the library, plus the approval-gated live 8K relay
12languages at peak, aligned to the BHASHINI set already standardised for KumbhDoot
05One decision that shapes both AR componentsInside the Authority's own app
The constraintOn the days this matters most, the mobile network in Panchavati and Trimbakeshwar will not be usable. Anything that needs a live connection will fail exactly when it is needed.

Not a second app. A module inside the one the Authority is already building.

Augmented reality can be delivered two ways. Through a web link, which needs no installation but needs signal at the moment of use. Or inside an application, which downloads its content once and then works with no connection at all. At a Kumbh, only the second is honest.

/01

Downloads once, works offline

Site content is fetched over Wi-Fi — at the station, at an VR Centre, at the tent city, or at home before travel — and cached on the handset. From that point the layer runs in aeroplane mode. A pilgrim in Panchavati with no signal gets the full experience.

/02

Nothing new to install

A pilgrim will install one government application for this Mela, not two. Everything here rides inside the Authority's app as a module its own development team integrates — not as a competing download the public has to be persuaded to find.

/03

One identity, one assistant

Every AR experience and printed artefact resolves back into KumbhDoot for anything it cannot answer — the same assistant, helpline and lost-and-found, across WhatsApp, IVR, kiosk and app. The pilgrim never crosses a brand boundary.

What this means practically. We deliver a documented software module and content pipeline to whoever is building the Authority's application. Integration is theirs, content and experience are ours, and the Authority owns both. A lightweight web route is retained as a fallback for a visitor who will not install anything, but it is the exception rather than the design. We would ask to be brought into the application's architecture conversation early, because offline caching at this volume is a decision that must be designed in rather than added afterwards.

06Component 01 in detailAR on printed material
The gapThe Authority and its departments will print at enormous volume, and none of it can answer a question, correct itself when the plan changes, or report that it was read.

We do not need to know what you will print. Any of it can open.

The Authority and its departments will produce printed matter across many offices over twenty-one months, and no one can list all of it today. That does not matter, because the layer is not tied to a particular artefact. Anything printed can carry it — a route card, a calendar, a prasad box, a hoarding, a newspaper page — and what the layer then delivers falls into four classes. The component includes the print itself, because a marker added to somebody else's finished artwork performs a fraction as well as one designed into the composition from the start.

Class of experiencePrinted matter it applies toWhat the layer does
Class 01Wayfinding & live maps Official Kumbh map · route and marg card · parking and shuttle pass · ghat allocation slip · Sadhugram and Akhara directory map The printed map becomes a live one: current ghat status, diverted margs, shuttle positions and the walk from where the visitor is actually standing. A card printed in June still gives the correct instruction in August.
Class 02Instruction & advisory Darshan calendar for the Nashik and Trimbakeshwar muhurtas · health, heat and water advisory · do's and don'ts card · volunteer and marshal handbook · tent city and dharamshala welcome kit Spoken instruction in the pilgrim's own language, for a reader who may not read at all. The marshal's handbook shows the plan as it stands this morning rather than as it stood at print.
Class 03Devotional & ritual Aarti and stotra booklet · panchang · prasad packaging and sealed boxes · snan commemorative folio Sung aarti with the words following, the meaning of the muhurta being observed, and the story of the tirtha the pilgrim is standing in. The devotional object becomes the doorway.
Class 04Storytelling & invitation Newspaper supplements in Marathi, Hindi and English · hoardings on the Mumbai–Agra corridor, ring road, station and airport approaches · rail and MSRTC ticket jackets · MTDC and Maharashtra Tourism collateral A preview of the interpreted heritage sites, delivered before travel and outside the district. This is where dispersal is seeded — a family decides to visit Gondeshwar while reading a supplement at home.

And print becomes measurable for the first time. Opens logged by artefact, placement, page, language, hour and district of origin. After the first Amrit Snan the Authority knows which pieces are being used and which are being discarded, and can print differently for the second. No administration has previously had attribution on Kumbh print.

07Component 02 in detailAR at the heritage sites
The design ruleAugmented reality only works where a person can stand still. Inside a crowd, nobody takes out a phone and holds it up — and if they do, they should not.

We have deliberately left the famous sites out of this component.

Ramkund, Kushavarta, the Kalaram approach, Sita Gufa, the Trimbakeshwar sanctum and the ghat faces are not AR sites. They are where density is the operational problem, where a stationary visitor holding a phone is an obstruction, and where the crowd plan is actively trying to keep people moving. Those places are served instead inside the VR Centres — explained at length, from a seat, several kilometres away. They receive more interpretation this way, not less. What remains is a different and better inventory: thirty-two surveyed sites of genuine worth where a visitor can actually stop, of which ten are priced in phase one and marked below.

12

Group A — Nashik city, off the snan axis

Within the city, reachable on foot or by a short auto ride, away from the bathing corridor. Five priced in phase one.

Pandavleni Caves, twenty-four Buddhist excavations on Trirasmi hill · the Dadasaheb Phalke Smarak at their foot · Chamar Leni · Naroshankar Mandir and its bell · Sundarnarayan Mandir · Tilbhandeshwar · Modakeshwar Ganpati · Navshya Ganpati · Someshwar · Muktidham · the Coin Museum · the Artillery Centre Museum at Deolali
8

Group B — Trimbakeshwar taluka, off the temple axis

The second Kumbh centre has a hinterland almost nobody interprets. Three priced in phase one.

Anjaneri and the Anjaneri plateau · the Brahmagiri ascent and Gangadwar · Nivruttinath Samadhi Mandir · Nilambika and Dattatreya · the Trimbakeshwar outer prakara and its Hemadpanti stonework, read from outside the sanctum · Ahilya Kund and the permanent Sadhugram ground · Harihar Fort · the Dugarwadi approach
12

Group C — the district dispersal ring

The tier that gives a diverted pilgrim somewhere worth going. Several sit on the Nashik–Shirdi corridor. Two priced in phase one.

Gondeshwar Temple, Sinnar · the Gargoti Museum, Sinnar · Saptashrungi Gad at Vani · Veer Savarkar's birthplace at Bhagur · Mangi Tungi and the Statue of Ahimsa · Salher Fort · Ramshej Fort · Dhodap Fort · Renuka Devi and the Rang Mahal at Chandwad · the Ankai–Tankai caves · the Paithani looms at Yeola · Tringalwadi Fort, Igatpuri

Sites shown in bold are the ten priced in phase one, spread deliberately across all three groups. The remaining twenty-two are surveyed and available at the same per-site rate. Final selection and any substitution is confirmed by joint survey with the Tourism Department and MTDC.

08What a visitor actually gets at a siteThree layers

Stop them. Tell them. Send them away knowing something.

Most heritage technology does only the middle one — it puts text on a screen and calls that interpretation. Every point of interest in this programme is authored across all three layers, and a point is not signed off until all three exist.

Layer 01

Engagement — what makes them stop

The reveal. What is missing, rebuilt and standing in place. The tower restored to its original height above the surviving base. The light of a different hour. A carved narrative band moving through its sequence. Scale shown against a human figure. Nothing on this layer is text. It exists to buy the eight seconds in which the other two become possible.

Layer 02

Information — anchored to the object

What it is, who made it, when, under whose patronage, in what material and why that material dictated the form. Delivered as audio first with visual support, at the pace of someone standing in front of the thing rather than reading about it later. Attached to the specific feature, not to the site as a whole.

Layer 03

Learning — what they take away

A comparison that makes the knowledge portable: this against that, this period against the next. A "read the stone" mode that teaches a visitor to identify a motif and then find three more unaided. A trail connecting this site to the next. And a short takeaway into their app, in their language, to show someone who was not there.

Why the third layer matters most. Engagement produces a photograph. Information produces a nod. Learning produces the sentence a pilgrim says at home three weeks later — which is the only one of the three that brings anybody back to Nashik outside a Kumbh year. It is also the only layer that can be tested with an instrument rather than a headcount, and it is what the evaluation programme is built to measure.

09Worked exampleGondeshwar Temple, Sinnar

Not the most visited site in the district. Arguably the finest.

An eleventh- to twelfth-century Shiva temple of the Yadava period in black basalt, on a platform of roughly 125 by 95 feet. A complete panchayatana: a central shrine with four subsidiary shrines at the corners for Vishnu, Surya, Parvati and Ganesha. Bhumija shikhara. Widely held to be the largest, most complete and best preserved medieval temple in the Deccan — and on most days almost empty. Twenty-six kilometres from Nashik on the Shirdi road, which is to say directly on a corridor a diverted pilgrim is already travelling.

Gondeshwar temple as it survives
Gondeshwar temple, reconstructed
Layer 01 Engagement — the reveal
  • The panchayatana made whole. The four corner shrines are damaged and several idols are gone. They are rebuilt in place, standing over the ruin, so the visitor sees the complex as completed rather than as it survives.
  • The shikhara restored. The Bhumija tower's full original profile rises from the surviving base — the single most dramatic moment available at this site, and the one that will be photographed.
  • Light at the hour it deserves. The temple is at its best at sunrise and sunset. A visitor arriving at two in the afternoon sees it lit as it is at dawn, from where they are standing.
  • One carved band, moving. A single relief sequence animated through its narrative, so the visitor understands the stone is telling a story rather than decorating a wall.
Layer 02 Information — anchored to the feature
  • Who and when. The Seuna Yadavas, Sinnar as Seunapura, and the disputed attribution between Rav Govinda and Govinda Raja — presented as disputed, because it is.
  • What Bhumija means, and how the shikhara's vertical bands of miniature spires differ from anything the visitor will have seen at Trimbakeshwar or in Panchavati.
  • Who occupies each of the five shrines, read at each doorway rather than from a board at the gate.
  • The material argument. Local black basalt, worked dry with lime, and how the hardness of that stone produced this carving style rather than a softer one.
  • Hemadpanti, and who Hemadri Pandit was — a term the visitor will hear repeatedly across Maharashtra and almost certainly cannot define.
Layer 03 Learning — what leaves with them
  • Three temples, one screen. Gondeshwar against Trimbakeshwar against Kalaram — eleventh century, eighteenth century, late eighteenth century. Three patrons, three styles, one district. After this comparison a visitor can roughly date a Maharashtrian temple by eye for the rest of their life.
  • Read the stone. The layer teaches four motifs, hides itself, and asks the visitor to find them unaided on the mandapa pillars. Correct identification is confirmed by the camera.
  • The Yadava trail. Stop one of a district trail continuing to Ankai–Tankai and Chandwad — a genuine two-day itinerary for a pilgrim with time between Parva days.
  • A takeaway to the app, in their language: four images, six sentences, and the trail map. Something to show at home, which is where a return visit is decided.
Operational What the Authority gets
  • Points of interest: six — the platform approach, the shikhara, the mandapa pillars, the sanctum doorway, one corner shrine, one relief band.
  • ASI position: centrally protected. No physical intervention of any kind; documentation permission sought in the normal course. No structure within the prohibited or regulated zones.
  • Siting: nothing on the monument. Signage and the offline download point sit at the existing car park, outside the regulated boundary.
  • Dispersal value: directly on the Nashik–Shirdi corridor, with existing parking, free entry and no crowd management burden on the Authority.

The same three-layer treatment is authored for each priced site, at fifteen experiences per site — one hundred and fifty authored experiences across the ten sites of phase one. The remaining twenty-two surveyed sites are available to the Authority on the same per-site basis. The exact allocation is fixed by joint survey and reported before production begins.

10Component 03 in detailThe VR Centres
The gapOn an Amrit Snan morning most of the people in Nashik cannot reach the water, and at present they are offered nothing in its place.

Not a VR arcade. A building with four different ways in.

A headset suits some visitors and not others. An eighty-year-old will decline one; a child wants to touch something; a pilgrim with no smartphone still needs to be served. So each centre carries several ways in under one roof — the VR zone, interactive screens, AI guide kiosks and a mirror screen — and the visitor chooses their own. Every location sits where the crowd plan already wants people: at the parking nodes where private vehicles are stopped several kilometres out, at the shuttle boarding points, the stations, the tent city and the medical camps.

Tier A — Anchor VR Centres

2 centres · approx. 3,500 sq ft each

Where

Tapovan / Sadhugram precinct, Nashikand Ahilya Kund / permanent Sadhugram, Trimbakeshwar

VR zone

30 VR stationsHosted, seated, 8–12 minutes, reset between guests

Interactive screens

8 stationsTouch walls and low tables for standing and seated use

AR mirrors

2 installationsThe Mirror of the Marg — described below

Alongside

4 interactive AI guide kiosks · live darshan and ghat status board · quiet and accessible bay

Tier B — Node VR Centres

6 centres · approx. 1,800 sq ft each

Where — Nashik

Nashik Road railway station · Nashik CBS and Mahamarg bus stand · Tapovan tent city · satellite parking and shuttle boarding on the Mumbai–Agra approach

Where — Trimbakeshwar

Trimbak road holding area on the Nashik–Trimbak corridor · Trimbakeshwar bus stand and parking

VR zone

20 VR stations each120 across the six

Interactive screens

4 stations each24 across the six

AR mirror

1 installation each6 across the six

Alongside

1 AI guide kiosk · live darshan and ghat status board · accessible bayThe status board alone makes the centre worth entering: it tells a pilgrim when it is sensible to move

Network capacity, and the limit we will state before anyone asks

  • VR Centres8
  • VR stations180
  • Interactive stations · AR mirror screens · AI guide kiosks40 · 10 · 14
  • VR sessions per day, all centres running~15,100
  • AR mirror uses per day~4,200
  • Theoretical maximum per day~19,300
  • Planning figure after derating for changeover, breaks and downtime~15,456

And the honest limit: measured against the Authority's own peak-day projection, this network still serves a fraction of one per cent on an Amrit Snan morning. It is not a headcount instrument on those three days and anyone presenting it as one is selling. Its value lies across the other six hundred and thirty days of a twenty-one month Mela, at the nodes where holds form, and in the specific cases — the elderly, the ill, the pilgrim who travelled a thousand kilometres and cannot make the final walk — where it is the difference between a completed pilgrimage and an abandoned one. On peak mornings we plan for closure unless the crowd team wants a node open as holding relief.

11Inside a centreWhat a visitor finds inside

Format 01

The VR zone

Recliners in rows, an attendant to every four seats, headsets sanitised and reset between guests. The deepest of the four — and the slowest, and the one some visitors will refuse. Eight to twelve minutes, tap to start, one physical button for reset. Carries the places nobody can otherwise reach: Kushavarta before dawn, the inside of Sita Gufa, the sanctum approach.

Format 02

The AR mirror

A six-foot screen showing the space in front of it, live, the way a mirror does — except the city behind the visitor has been changed. Two at each anchor centre, one at each node. A family sees itself on the same ghat eight hundred years ago, in its own clothes. No face is stored and no individual is altered.

Format 03

The interactive screens

For the things people want to poke at rather than be told. All thirty-two surveyed heritage sites as a browsable map with routes and distances. The thirteen Akharas and their lineages. The Godavari from Brahmagiri to the sea. The temple-dating comparison from the learning layer. Self-paced, no queue, no staff, no session length.

Format 04

The mirror screen

The Mirror of the Marg, in ten installations — two at each anchor centre and one at every node. The space in front of it rendered into the Nashik of another century: the same street, the same ghat, the same procession route, eight hundred years apart. Visitors see themselves in the frame as a crowd, in their own clothes.

Alongside

The interactive AI guide kiosk

KumbhDoot given a screen and a voice, for the pilgrim with no smartphone and nobody to ask. Fourteen kiosks across the network, at standing and seated height, voice-operable end to end, in the same language set the Authority has already standardised on.

Alongside

The status board

A live darshan and ghat status board at every centre — the reason a pilgrim walks in even if they want nothing else, because it tells them when it is sensible to move.

On the mirror, a design decision worth stating openly. The obvious version of this installation dresses the individual visitor in period or religious attire. We have not proposed that version. At a Kumbh, an installation that alters a devotee's likeness into borrowed religious dress carries reputational exposure for the Authority and no corresponding benefit, and it requires face capture on pilgrims that this programme rules out elsewhere. The version proposed alters the city, not the person. No face is stored and no individual is modified.

12Inside the centres, on three morningsThe live 8K relay

The closest sanctioned vantage — held open for someone four kilometres away.

A live, very high resolution, 360-degree relay from fixed positions at Ramkund and Kushavarta, carried to every centre in the network and played in the VR zone. The pilgrim is placed at a vantage point the physical queue cannot offer anybody: still, unobstructed, at the front, for as long as they wish to stand there. Not a broadcast on a screen — a position.

Technical shape

Three Amrit Snan mornings, plus principal aarti

Capture

Fixed 8K 360° camera rigs, two to three per siteProfessional stitching servers, sub-second latency. Positions agreed with police and fixed in advance; no operator moves inside the cordon.

Why 8K and not 4K

A headset shows only 90–120° of the sphere at a timeAt 4K the visible portion is soft. 8K is the practical floor for this to read as presence rather than as video.

Bandwidth

Order of 80–150 Mbps per feedNot deliverable over public mobile networks on a Parva morning. Entirely deliverable over the Authority's own 385 km fibre — which is precisely what makes this possible in Nashik and impossible at most events.

Delivery

Viewport-adaptive streaming to the centresFull resolution sent only to where each viewer is looking, which keeps the aggregate load across the eight centres manageable.

Naming

To be ratified, not assumedWhether this is presented as darshan or as a relay is a question for the Akhara Parishad and the Trusts, not for us. The build is identical either way; the words on the screen are not.

Treatment in scope

A separate, switchable componentBuilt so it can be withdrawn in June 2027 without disturbing any other part of the programme.

Three approvals gate this, and we will not pretend otherwise. Camera positions inside a police cordon on the highest-pressure morning of the year. Guaranteed backhaul on the Authority's fibre, contracted rather than assumed. And a ruling from the Akhara Parishad on whether a live relay of the snan may be presented at all — because if the answer is that it is a broadcast and not a darshan, it must be named a broadcast. If any of the three does not come, the centres carry the recorded library instead and nothing else in the programme changes.

13What plays in the centres8 experiences and the live relay

Eight experiences, and the live relay.

Eight to twelve minutes each, by design: long enough to build the memory of having been somewhere, short enough that nobody starts working out how to leave politely. Every script is developed with the Akhara Parishad, the relevant Devasthan Trust and the state's own historians, and approved before a line is recorded.

#ExperienceFormatWhat it carries
01Simhastha — why here, why now, why every twelve yearsVR · 12 minSamudra Manthan, the falling drops, Jupiter's entry into Simha, the Godavari's descent from Brahmagiri. Most pilgrims can name the ritual and not the cause.
02Kushavarta at dawnVR · 8 minThe kund empty and still, at an hour no pilgrim will see during the Mela.
03Trimbakeshwar — the approachVR · 8 minThe Jyotirlinga approach and carving programme at a proximity the physical queue cannot allow. Subject to Devasthan Trust approval on what may be shown.
04Ramkund and the ghats through the centuriesVR · 8 min1696, Gopikabai's restoration, and the ghat sequence as it changed. The site the pilgrim is queueing for, explained while they queue.
05Panchavati — the Ramayana in placeVR · 8 minThe five banyans, Sita Gufa, Tapovan and the episode that named the city — including the interior of Sita Gufa, which most visitors physically cannot enter.
06Pandavleni — two thousand years of carvingVR · 8 minThe Buddhist excavations on Trirasmi hill and their inscriptions. A dispersal instrument as much as an experience: it makes people want to go.
07The PeshwaiVR · 8 minThe Akhara procession, from archival material and new capture, with the Akharas' participation and consent. For everyone who will never get near the route.
08AnjaneriVR · 8 minA destination most pilgrims never reach, and a hill worth diverting to.
09The live relayLive · VRApproval-gated and wholly separable. Played in the VR zone across the three Amrit Snan mornings.

Languages

3 at opening, 12 at peak, 22 as the target

Marathi, Hindi and English from Dhwajarohan; twelve by the Amrit Snans; extending toward the full BHASHINI set already standardised for KumbhDoot. One hundred and fifty heritage experiences and eight VR experiences across twelve languages is close to 1,900 discrete audio deliverables — the largest single production line in the programme.

Production

Audio-first, not text-first

A significant share of pilgrims will not read a screen. Every experience is authored so the audio alone carries the full content, with the visual as support. This also makes the audio-described version a by-product of the main build rather than a bolt-on.

Refresh

Real-time engine, not a fixed render

A finished film is finished. Across twenty-one months the Authority will want to change a name, a date, a route, a piece of guidance. In a real-time build most of that is an afternoon's work by the Authority's own team — which is what stops the network going stale by the third quarter.

14Underneath all threeThe capture programme

One capture programme. Every experience built from what it records.

The ten interpreted heritage sites are captured for reference as part of each site's rate; with the digital twin add-on, the eight places in the VR library — Ramkund and the ghats, Kushavarta, the Trimbakeshwar approach, Panchavati, Pandavleni, the Peshwai route, Anjaneri and the Brahmagiri source of the Godavari — are captured as full walkable twins and assembled with the site captures into a single georeferenced record. At Pandavleni and Anjaneri, which are also interpreted sites, the walkable twin extends the reference capture rather than repeating it. The AR layers and the VR experiences are built from that one record, and the interactive screens draw on it — which is why they agree with each other and why a correction made once propagates everywhere.

It also has a life independent of this programme: a conservation baseline for every place it records, a spatial reference for the ghats it covers, and the planning reference for 2039.

Method

Gaussian splat capture, registered to laser scan

Splat capture holds carved basalt, wet ghat steps, brass, water and low interior light in ways older photographic methods do not, and renders on a handset rather than a workstation. Where dimensional accuracy is required — conservation record, crowd modelling, structural reference — it is registered against a laser scan. Non-contact throughout; nothing is touched and nothing is attached.

Window

After the works finish, before the crowds arrive

From early 2027 the sites are scaffolded, hoarded or occupied, and the Simhastha then runs to July 2028. Sixteen weeks, two teams in parallel — one per town — which covers the ten reference captures and the eight walkable twins with room for permissions, night access and reshoots.

Precedent held by the delivery team

Golconda Fort, complete site twin in about two weeks

Every wall, stair and courtyard of a fortress complex, captured end to end. The closest existing analogue to what this programme requires, and demonstrable on a screen rather than described.

15Why Nashik

In 1913 a man from this city put a mythological on a screen, and India had not seen it done before.

Dhundiraj Govind Phalke made Raja Harishchandra and invented a form. His memorial stands at the foot of Pandavleni, below caves where people were carving the same stories into rock two thousand years earlier. Nashik is not adopting immersive storytelling in 2027. Nashik has been the place where sacred narrative meets the newest available machine for a very long time, and the machine has changed perhaps four times.

Why it is not merely a good line

It answers the objection that will be raised in every review

Somebody will say that headsets and screens cheapen a religious occasion. It is a fair objection and deserves a real answer rather than a defensive one. The answer is on that hillside: rock, then paint, then Phalke's camera, then this. The form has always changed. The obligation — that it be done reverently, accurately and well — has not.

What it gives the Authority

A positioning no other Kumbh city can claim

Prayagraj has the Sangam. Haridwar has the Ganga. Only Nashik can claim to be where India first told these stories with a new machine — and the site that proves it is a Group A heritage site in this programme, a hundred metres from the memorial.

16ComplianceUnder the authorities of the land

Every component sits inside a framework that already exists.

Nothing here requires a new exemption. The purpose of this section is to show that the statutory route for each component has been identified in advance, so approvals are a schedule rather than a discovery.

Siting & development
Nashik–Trimbakeshwar Kumbh Mela Authority Act, 2025 (Act 33 of 2025), Sections 13 and 14. The Authority is competent to permit development and temporary structures notwithstanding the Maharashtra Regional and Town Planning Act, 1966, and to permit trade and profession within the Mela area. Every VR Centre is a demountable temporary structure permitted under that head; no separate municipal planning route is required.
Coordination
The same Act, Section 8, empowers the Chairperson — the Divisional Commissioner — to direct departments, local authorities, statutory bodies and public trusts across Nashik Division. That is the instrument by which Devasthan Trust access, police siting sign-off and departmental print calendars are convened in one meeting rather than twelve.
Protected monuments
Ancient Monuments and Archaeological Sites and Remains Act, 1958. Pandavleni, Chamar Leni, Gondeshwar and several Group C sites are centrally protected. No structure is proposed within the 100-metre prohibited or 200-metre regulated zones; download points and signage sit outside both. The AR layer involves no physical intervention. Documentation permissions are sought from ASI in the normal course.
Places of worship
Capture and content at Trimbakeshwar, Nivruttinath, Saptashrungi and the Panchavati temples proceeds only under written permission from the relevant Devasthan Trust, with the Trust holding approval over what may be depicted. Where a Trust declines, the site leaves the programme without argument.
Environmental
Tapovan is subject to live proceedings before the National Green Tribunal concerning tree cover, and the Godavari is under continuing conservation direction through the Municipal Corporation's Godavari Conservation Cell. All siting is demountable and ground-anchored rather than excavated, and cleared against the prevailing orders before design.
Accessibility
Rights of Persons with Disabilities Act, 2016, Sections 40–46; the Harmonised Guidelines and Space Standards for Universal Accessibility in India, 2021; and IS 17802 for ICT accessibility, enforceable through the RPwD (Amendment) Rules, 2023. The in-app layer targets GIGW 3.0 and WCAG 2.1 AA, which the Authority's own application will be held to regardless.
Data
Digital Personal Data Protection Act, 2023. All analytics aggregate and non-identifying; all data resident in infrastructure the Authority controls; no third-party advertising or analytics components anywhere in the stack. A Data Protection Impact Assessment delivered before any component goes live.
Procurement
Structured for award through the Authority's existing e-tender and rate-contract mechanisms, with IIT Guwahati engaged under a Memorandum of Understanding as institutional and technical lead, and implementation contracted beneath that instrument.
17GovernanceWhat this programme will not build

The fastest way to damage a Kumbh is to be clever about something sacred.

These are drafted as contractual restrictions rather than as a statement of values. If the Authority wishes any relaxed, that is the Authority's decision to record in writing. The default is no.

18AccessLanguage, ability, and the pilgrim with no phone

The pilgrim who most needs this is the least likely to be able to use it.

The Authority has set the standard with KumbhDoot: a pilgrim on a basic feature phone must receive the same service as one on a smartphone. The in-app layer cannot meet that standard alone, and we will not claim otherwise. The three components are designed to cover for each other.

No smartphone
The AR layer does not reach this pilgrim. The VR Centres do — interactive screens, AI guide kiosks and the mirror require the visitor to own nothing at all. And every printed artefact is a complete artefact in ink first: the route card works whether or not anyone opens the layer.
Will not wear a headset
Every centre carries a full no-headset route: interactive screens at standing and seated height, a voice-operable AI guide kiosk, and the mirror screen. None of them asks the visitor to put anything on their face.
Blind and low vision
Every experience ships with a full audio-described track as standard, a direct consequence of authoring audio-first. The heritage layer is voice-led by default. Kiosks are voice-operable end to end.
Deaf and hard of hearing
Captions in every language on every piece; a haptic cue for session start and end at every seat; visual queue-state and status indicators at all eight centres.
Mobility and age
Recliners rather than standing bays. Step-free entry at every centre to the Harmonised Guidelines. The attendant seats the guest. Kiosks and interactive tables at both standing and seated heights.
Sensory
Volume-capped, no strobe, no sudden darkness, a documented exit-at-any-time gesture, and scheduled quiet hours at every centre.
Connectivity
All in-app content cached at download and fully operable offline. Centres run on the Authority's fibre where it reaches and on independent backhaul where it does not.
19Research & evaluationThe institutional role

No Kumbh has ever published a controlled evaluation of whether any of this changes anything. Nashik can be the edition that does.

Prayagraj deployed at scale and published visitor counts. That is not the same as evidence. This programme is led by an institute so that the measurement design sits with a research team kept separate from the people building the installations, and so the findings are published whichever way they fall.

Layer 01

Reach and behaviour

In-app opens and sessions by site, artefact, placement, language, hour and district of origin. Occupancy, queue length, refusals and drop-outs at all eight centres, by format. Visitor counts at all ten interpreted sites, week over week, against a baseline set before the Mela opens.

Layer 02

Dispersal and crowd effect

The question that matters. Did Group C sites gain visitors, and did the ghats lose pressure in the same window. Dwell at nodes with a centre against matched nodes without one. Willingness-to-hold, recorded by the marshals working those points. Sourced from the Authority's own command-centre data, not ours.

Layer 03

Learning, comprehension and reverence

Structured intercept surveys in Marathi and Hindi at centre exits and heritage sites, against a matched sample of non-users. Did they retain what the learning layer taught. Would they return outside a Kumbh year. Did it feel respectful — asked directly, and reported even when the answer is unwelcome.

What the institute contributes that a supplier cannot. Baselines set before deployment rather than after. Instruments designed and published under the Institute's research governance, by an evaluation team kept separate from the delivery team. Peer-reviewed publication, which makes Nashik the reference edition that Ujjain, Haridwar and Prayagraj cite. Capacity building, so Authority staff and Maharashtra institutions can operate and extend the system beyond 2028. And an assurance layer over delivery the Authority does not have to construct itself.

20CommercialsWhat each component costs
How it is pricedBy the unit, not by the programme. Print by the experience. Heritage by the site. Centres by the centre. Every figure below is exclusive of GST.

Priced so the Authority can buy exactly what it wants.

Nothing here is an all-or-nothing figure. Every rate is all-in — delivery coordination, insurance and a 15% project management and handling fee are already inside it — so the Authority can assemble any combination of components, in any quantity, and the total is simply the sum of what it picks. Add a heritage site and the price moves by one site rate. Add a node centre and it moves by one centre rate. The digital twin and the VR experiences built on it sit outside the core, as an add-on. A high-level breakdown accompanies each rate; the full bill of quantities is available to the Authority on request.

ComponentUnitRate, plus GSTWhat the rate includes
Component 01AR on printed material Per experience
Quantity set by the Authority
₹10,22,465
plus GST, per experience
Base ₹8,89,100
15% handling fee ₹1,33,365
Artefact design and print production coordination · marker and layer authoring · 3D, motion and audio assets · twelve languages, authored audio-first · integration into the Authority's application · offline caching · on-device QA across the Android range · scan analytics by artefact, placement and language.
No quantity is assumed. The Authority states how many printed artefacts it wants covered, and the rate applies to each.
Component 02AR at the heritage sites Per site
15 experiences at each site
₹1,60,06,965
plus GST, per site
Base ₹1,39,19,100
15% handling fee ₹20,87,865
Fifteen authored experiences at one site, each built across the engagement, information and learning layers · reference capture of the site · script development with the relevant Devasthan Trust and the state's historians · reconstruction and 3D assets · twelve languages · in-app delivery, fully cached for offline use · on-site anchoring, calibration and QA · site analytics.
Ten sites priced in phase one: ₹16,00,69,650 plus GST, including the handling fee. Each further site from the surveyed inventory of thirty-two is quoted at the same rate.
Component 03VR Centres — priced per centre
LineUnitRate, plus GSTWhat the rate includes
Tier AAnchor VR Centre Per centre
2 centres
₹5,35,09,845
plus GST, per centre
Base ₹4,65,30,300
15% handling fee ₹69,79,545
Civil works, site preparation and a demountable structure of roughly 3,500 sq ft · power, DG and UPS · network, CCTV and access control · fit-out, signage and furniture · 30 VR stations with recliners, device management and a replacement allowance · 2 AR mirror installations · 8 interactive screen stations · 4 AI guide kiosks · experience integration and commissioning · attendants and maintenance for the operating period · freight and deinstallation at the close.
Tier BNode VR Centre Per centre
6 centres
₹2,83,16,220
plus GST, per centre
Base ₹2,46,22,800
15% handling fee ₹36,93,420
The same at node scale, in roughly 1,800 sq ft: 20 VR stations · 1 AR mirror installation · 4 interactive screen stations · 1 AI guide kiosk · integration, attendants and maintenance for the operating period.
NetworkSoftware and operations Once
With any centre
₹5,94,18,660
plus GST
Base ₹5,16,68,400
15% handling fee ₹77,50,260
The VR application platform, session control, device management and analytics · centre operations, queue and live status boards, integrated to the command centre · the AR mirror runtime and a library of 12 mirror experiences · the interactive screen and kiosk application suite · operator training, two full-load dry runs and load testing.
Built once and inherited by every centre. A ninth centre carries the centre rate only.
RelayLive 8K darshan relay Once
Approval-gated
₹3,74,41,240
plus GST
Base ₹3,25,57,600
15% handling fee ₹48,83,640
Fixed 8K 360° rigs at Ramkund and Kushavarta, stitching and encode, distribution over the Authority's fibre, the VR client, and operations across the three Amrit Snan mornings. Gated on three approvals and wholly separable — it can be withdrawn without disturbing anything else.

Where the eight centres go

Sited to the crowd plan, confirmed with police before design

Anchor 01

Tapovan / Sadhugram precinct, NashikThe largest captive population of the Mela, and the permanent Sadhugram site afterwards.

Anchor 02

Ahilya Kund / permanent Sadhugram, TrimbakeshwarThe second Kumbh centre, thirty-one kilometres away and operationally a separate town.

Node 01

Nashik Road railway stationThe single highest arrival volume in the district.

Node 02

Nashik CBS and Mahamarg bus standBus arrivals, and the longest unmanaged waits.

Node 03

Tapovan tent cityA resident population for the full twenty-one months.

Node 04

Satellite parking and shuttle boarding, Mumbai–Agra approachWhere private vehicles are stopped several kilometres out and pilgrims transfer to shuttles.

Node 05

Trimbak road holding area, on the Nashik–Trimbak corridorWhere the crowd plan holds people between the two towns.

Node 06

Trimbakeshwar bus stand and parkingTrimbakeshwar arrivals and the Kushavarta approach.

Every one of these is a place the traffic plan already holds people. None sits inside a ghat approach cordon. Siting is confirmed with police and the crowd-modelling team before any centre is designed, and each carries a stated maximum standing density and a named officer who can close it.

Programme-wideTaken once
LineUnitRate, plus GSTWhat the rate includes
OnceAR application module and SDK Once
With any AR component
₹1,57,13,830
plus GST
Base ₹1,36,64,200
15% handling fee ₹20,49,630
The AR module delivered to the Authority's own application team, with offline caching, the content pipeline and documentation.
OnceProgramme assurance, evaluation and guarantee Once
Whole programme
₹1,87,38,560
plus GST
Base ₹1,62,94,400
15% handling fee ₹24,44,160
Governance and programme assurance, evaluation design and reporting by a team kept separate from delivery, and the performance bank guarantee.
Add-onThe digital twin and the VR library built on it

Priced separately, because it outlives the programme.

Each twin space is captured as a full walkable twin, and the VR experience in the centres is built directly on it — so the two are priced together, per space. Once the twins exist they also feed any screen-based surface the Authority is already deploying elsewhere across the Mela, and they remain a permanent conservation record of the Kumbh geography, owned outright by the Authority, and the planning reference for 2039.

LineUnitRate, plus GSTWhat the rate includes
Add-onTwin space and its VR experience Per space
8 spaces
₹99,83,495
plus GST, per space
Base ₹86,81,300
15% handling fee ₹13,02,195
A full walkable twin of one space the AR layer deliberately leaves out — complete coverage, laser-registered, VR-grade optimisation, navigation mesh and QA — and the VR experience built on it, in twelve languages.
Add-onTwin master library Once
With the add-on
₹73,33,090
plus GST
Base ₹63,76,600
15% handling fee ₹9,56,490
Assembly and georeferencing of the twins into a single library, and handover to the Authority. Capture runs in the window between the works finishing and the crowds arriving; that window does not reopen before 2039.

One dependency, stated plainly. The eight VR experiences are built on the twins, so they are priced with them. If the add-on is not taken, the centres still open and still carry the AR mirrors, the interactive screens, the guide kiosks and the live relay — but the VR stations would have only the relay to show, on three mornings. We recommend the add-on is taken with any VR Centre.

ElectionsTwo choices that reduce the price
If the Authority elects toPerDeduct, incl. feeBasis
StaffingDeploy its own attendantsAnchor centre
Node centre
₹1,19,84,380
₹71,90,605
Attendants are priced in and recruited in Nashik, including through self-help groups, so Mela income stays in Nashik households. If the Authority prefers to deploy its own staff, the attendant line comes out of each centre; integration, maintenance and everything else stay.
LanguagesTake three languages instead of twelveHeritage site
Printed-material experience · twin space
₹70,71,235
₹4,71,385 · ₹16,02,755
Localisation into the nine additional languages comes out of the unit. Marathi, Hindi and English remain.

The programme, added up

  • Component 01 — AR on printed materialrate card, per experience
  • Component 02 — AR at ten heritage sites₹16,00,69,650
  • Component 03 — 2 anchor VR Centres₹10,70,19,690
  • Component 03 — 6 node VR Centres₹16,98,97,320
  • Component 03 — network software and operations₹5,94,18,660
  • Component 03 — live 8K darshan relay₹3,74,41,240
  • Programme-wide — AR module; assurance, evaluation and guarantee₹3,44,52,390
  • CORE PROGRAMME₹56,82,98,950
  • Add-on — 8 twin spaces with their VR experiences, and the master library₹8,72,01,050
  • CORE PLUS ADD-ON₹65,55,00,000
  • of which, project management and handling fee at 15%₹8,55,00,000

₹65,55,00,000 plus GST for the full programme including the add-on; ₹56,82,98,950 plus GST without it. Every figure includes the 15% project management and handling fee — ₹8,55,00,000 across the full programme. Component 01 sits outside both totals by design — it is quoted per experience and the Authority decides the volume. Because every rate is all-in, any combination the Authority chooses is simply the sum of the rates it picks.

Tax
Every figure in this section is exclusive of GST. Tax is charged at the rate applicable on the date of invoice.
Validity
Rates hold for ninety days from the date of submission. Beyond that, hardware lines are subject to re-quotation, because a twenty-one month programme cannot absorb device pricing movement at a fixed rate.
What is included
Twelve languages across every AR and VR experience · attendants and maintenance for the period the centres operate · public liability and equipment insurance · delivery coordination and site supervision throughout · the project management and handling fee.
Project management and handling fee
A project management and handling fee of 15% applies to every component, every quantity and every election, and is included in each rate shown — the base rate and the fee are stated beneath every figure. It applies in the same proportion to whatever the Authority selects.
What is not included
Electricity and water consumption · land · security · content refresh and on-call support after the programme closes. Each is quoted separately on request, as a disclosed option rather than a variation raised later.
Payment
Against countable deliverables, certified by the Authority: sites interpreted, centres commissioned, experiences delivered. Not against elapsed time.
Ownership
The capture library, the experiences, the AR module and the evaluation dataset are the Authority's outright. Interactive builds and the master source are licensed to the programme with ownership, hosting and hand-off recorded in writing before any payment is made.
21ProgrammeAgainst the actual calendar

Twenty-one months of operation, and the capture window opens in six weeks.

Sequenced so the irreversible work — capture — happens first, and so the Authority holds a genuine scaling decision at the end of each phase rather than a fait accompli.

Phase 0 On approval → Dec 2026

Survey, permissions and app integration

Joint survey with the Tourism Department and MTDC fixing which ten of the thirty-two surveyed sites are built in phase one, and the exact experience allocation within each. Permissions convened under Section 8: Devasthan Trusts, ASI, police siting protocol. Data Protection Impact Assessment delivered. Baselines set with the Authority's data team. And the integration conversation with the Authority's application team, because offline caching at this volume must be designed in rather than added later.

Phase 1 Nov 2026 → Mar 2027

Capture, the digital twin, and the print system

Sixteen weeks, two parallel teams: the ten interpreted sites captured for reference, the eight walkthrough spaces of the VR library captured as full walkable twins with the add-on. In parallel, the print system designed and the first printed artefacts produced and live, with the administration panel handed to the Authority's communications cell. All eight VR scripts written and approved.

Phase 2 Apr → Jul 2027

Build-out, commissioning and dry runs

Two anchor and six node centres fabricated, sited and commissioned. All heritage layers live in the app. All eight VR experiences finished in twelve languages. Interactive walls, mirror screens, kiosks and status boards installed and connected to the command centre. Attendants recruited in Nashik and trained. Two full-load dry runs with the crowd team empowered to fail the programme. Relay go/no-go in June.

Phase 3 Aug → Sep 2027

The three Amrit Snans

Full operation, with the delivery team on site in support rather than in command. Daily readouts to the command centre. Centres closed on peak mornings unless the crowd team wants a node open as holding relief. The first independent data on immersive provision at a Kumbh is generated here.

Phase 4 Oct 2027 → Jul 2028

The long tail, where the network does its real volume

Ten months of Simhastha remain after the Amrit Snans, at manageable density — when the centres perform best. Language coverage extends toward the full BHASHINI set. Dispersal is measured properly across a full season.

Legacy From Aug 2028

What Nashik keeps

The heritage library, and with the add-on the digital twin, owned outright, with the survey of all thirty-two sites ready for the next phase. The heritage layer live in perpetuity. Anchor centres relocating to the permanent Sadhugram and the district's museums. The evaluation dataset published. And the conservation baseline and planning reference for the 2039 cycle, made at the only moment it could have been made.

22DeliveryPartnership and scaling

Institutional lead

Indian Institute of Technology Guwahati

Engaged under a Memorandum of Understanding as institutional and technical lead: programme governance, independent evaluation design, technical assurance over delivery, capacity building for Authority and state staff, and publication of findings. Principal Investigator: Prof. (Dr.) Debayan Dhar, Department of Design, IIT Guwahati.

Delivery

The Institute's delivery team

Assembled and directed by the institutional lead, and contracted beneath the Memorandum of Understanding: capture and the digital twin, the in-app AR module, interactive print design and production, real-time experience builds, VR Centre design and commissioning, and operator training. Relevant record includes a complete site twin of the Golconda Fort complex delivered in around two weeks, and immersive training delivery for the Indian Army completed ahead of schedule.

Named partners

Fabrication, hardware and staffing

Structures, optics, compute, screens and power through named partners, itemised separately and disclosed before commitment. Attendants are priced in and recruited in Nashik, including through self-help groups, so Mela income stays in Nashik households. If the Authority prefers to deploy its own staff, each centre rate reduces by a stated amount.

Scaling — centres
Eight centres and 180 VR stations is the priced network — two anchor centres and six node centres, retaining both towns and the corridor between them. It can be extended centre by centre at the per-centre rate in the commercial section; it can equally be reduced to the two anchors alone.
Scaling — heritage
Ten sites are priced in phase one, drawn from a surveyed inventory of thirty-two and spread deliberately across all three groups. Every further site is quoted at the same per-site rate. Group C is the dispersal tier and the first thing to protect if the crowd objective is being taken seriously.
Scaling — print
All four classes is comprehensive. Classes 01 and 02 alone — wayfinding and instruction — carry most of the operational value and can be applied to a narrow, agreed list of artefacts before widening.
Scaling — language
Twelve languages are priced in. Three is available as an election at a stated deduction, and the full twenty-two can be quoted. The largest single swing in the production programme, and the lever the Authority can move in either direction without disturbing anything else.
Scaling — the relay
Wholly separable, and constructed to be withdrawn in June 2027 without affecting any other component.
Operations
Priced in from the outset — attendants and maintenance for the thirteen months the centres run, a hardware replacement allowance, operator training, and delivery coordination with an on-call rota through the peak. Content is served through the Authority's own application, and the print layer's administration panel sits with its communications cell for same-day updates. Immersive installations that omit this go dark by the third quarter.

Two limitations recorded up front. Volume 3D and asset production runs through a vetted specialist network that the delivery team art-directs and whose files the Institute owns — accountability sits in one place, but this is not a large in-house production department. And no organisation in this partnership has delivered at a Kumbh before; very few anywhere have. The phasing is constructed so that this is tested against real conditions in Phase 0 rather than discovered in August 2027.

23QuestionsAnticipated in review

What is the difference between AR and VR, in one line each?

+

Augmented reality adds something to the real place you are standing in, seen through your own phone — you are still at the temple. Virtual reality replaces the real place entirely with another one, seen through a visor — you are no longer in the room. AR is for people who are already at a site. VR is for people who cannot get to one.

Why is Ramkund not in the heritage AR list? It is the most important site in the Mela.

+

Because augmented reality requires a person to stand still and hold up a phone, and Ramkund is the one place in Nashik where the Authority is actively trying to prevent exactly that. A stationary visitor on a ghat approach is an obstruction, and on a Parva morning it is a hazard. Ramkund is instead one of the richest pieces in the VR Centre library — explained at length, from a seat, several kilometres away, while the pilgrim waits for a window to open. The site gets more interpretation this way, not less.

Why in-app rather than a web link? A link needs no installation.

+

Because a web link needs signal at the moment of use, and on the days this matters the network in Panchavati and Trimbakeshwar will not carry it. An in-app module caches its content once over Wi-Fi and then runs with no connection at all. It also keeps the pilgrim inside the Authority's own environment, with its identity, language set and assistant, rather than sending them to a web page. A browser route is retained as a fallback, but it is the exception rather than the design.

Eight VR Centres at a Kumbh. Are you not creating the hazard we are trying to eliminate?

+

The correct first question, and the programme is built around it. Nothing is designed until police and the crowd-modelling team have approved a location. Every centre carries a stated maximum standing density, a documented queue geometry and egress width, and a named officer empowered to close it. The default on Amrit Snan mornings is closure unless the crowd team wants a specific node open. The centres are sited at the parking and shuttle nodes where vehicles are already being stopped — where captive waiting is a designed feature of the traffic plan, not an accident.

Is any of this disrespectful to the Kumbh?

+

Done badly, yes. Three things make it so and all three are ruled out contractually: presenting a screen as a substitute for the snan, generating rather than recording sacred imagery, and monetising darshan. Every script is approved by the Akhara Parishad and the relevant Devasthan Trust before recording, and where a Trust declines, the site leaves the programme. Even the naming of the live relay is put to the Parishad rather than decided by us. The affirmative argument is the Pandavleni hillside: rock, then paint, then Phalke's camera, then this.

Why spend effort on sites like Gondeshwar that almost nobody visits?

+

Because "almost nobody visits" is the point. The dispersal value of the heritage component comes entirely from the district ring, and it only becomes a real alternative destination once there is something at each site to encounter. Interpreting only the famous sites concentrates visitors on the two places already under most pressure. Gondeshwar is also, on the architectural merits, among the finest medieval temples in the Deccan, sitting free and empty twenty-six kilometres from Nashik on the Shirdi road. It costs the Authority nothing in crowd management and returns a genuine destination.

Google, Meta, Microsoft and MIT are already engaged. What does this add?

+

A different layer entirely. What has been convened is a sensing, prediction and assistance stack, and none of it produces anything for a pilgrim to look at. Somebody still has to capture Kushavarta at first light, get a Marathi script past the Akhara Parishad, fabricate a structure that survives a Tapovan monsoon, and train an attendant who has already run nine sessions that morning. This programme sits underneath that stack and consumes its outputs. Access to the Kumbh AI Sandbox for stress-testing would be valuable and is requested.

The programme depends on approvals from many bodies. What if they do not come?

+

Each component is separable with a defined fallback. If a Devasthan Trust declines, that site drops and the count reduces. If the Akhara Parishad rules against the relay, the centres run the recorded library. If police decline a node, that node is not built. If the application team cannot integrate in time, the browser fallback carries the heritage layer at reduced quality. Nothing is architected so a single refusal takes down the rest — a deliberate choice, and the reason the approvals path is scheduled in Phase 0 rather than assumed.

What happens to all of this after July 2028?

+

It belongs to the Authority. The capture library, the digital twin where the add-on is taken, the experiences, the AR module and the evaluation dataset are owned outright; interactive builds and the master source are licensed to the programme with ownership, hosting and hand-off recorded in writing before any payment. In practice: the heritage layer stays live at every interpreted site permanently, the anchor centres relocate to the permanent Sadhugram and the district museums, and the twin becomes the conservation baseline and the reference for 2039.

Three things, one record underneath them, and a district that explains itself.

Augmented reality on the printed material, which reaches a household in another state before anyone boards a train and costs the Authority no land at all. Augmented reality at ten heritage sites, which gives a diverted pilgrim somewhere worth going and keeps working long after the Mela closes. And eight VR Centres carrying one hundred and eighty VR stations, placed exactly where the traffic plan is already holding people, with four different ways in so that nobody is excluded.

All three draw on one digital twin of the Kumbh geography, and that twin can only be made in the window between the works finishing and the crowds arriving. Whatever is concluded about the three components, the record of Nashik and Trimbakeshwar as they stand in the winter of 2026–27 is worth making for its own sake — and the next opportunity is 2039.

Indian Institute of Technology Guwahati Prof. (Dr.) Debayan Dhar · Principal Investigator Department of Design, IIT Guwahati

Prepared for the Nashik–Trimbakeshwar Kumbh Mela Authority, September 2026. Site inventories draw on the Nashik District Administration's published register of monuments, Maharashtra Tourism and Incredible India records, and Archaeological Survey of India listings; Group C is subject to confirmation by joint survey. Comparable installations referenced for illustration — the Pradhan Mantri Sangrahalaya, Shivsrushti at Pune, the Shaniwarwada sound-and-light show, and VR darshan counters at Kashi Vishwanath and Vaishno Devi — are the work of other organisations and are cited only to describe the formats. Statutory references are to the Nashik–Trimbakeshwar Kumbh Mela Authority Act, 2025 (Act 33 of 2025); the Ancient Monuments and Archaeological Sites and Remains Act, 1958; the Rights of Persons with Disabilities Act, 2016 and the Harmonised Guidelines and Space Standards for Universal Accessibility in India, 2021; IS 17802 as applied through the RPwD (Amendment) Rules, 2023; and the Digital Personal Data Protection Act, 2023. The digital backbone and assistant described are from NTKMA public statements and briefings, 2025–26. Point-of-interest counts, session throughput and derating factors are planning assumptions derived from stated capacity and are labelled as such wherever used; they are not forecasts, and delivery quantities describe the proposal's scope rather than an estimate of demand.